SDC Performance UK News
10 June 2013
Kawasaki ZXR400 race project - DAY 8
Engine has now been cleaned and serviced ready to start the bike final build . At the same time as the srvice , we have cleaned the engine ( a massive job on its own ) re painted the side casing to SDC red and also removed the fly wheel and turned it down in the lathe to reduce crank weight , the bike will be running total loss ignition.
Although the engine is being kept standard we are trying to get as much out of it as possible for the race day.
BEFORE
AFTER
Now finished and ready to build the bike
Category: General News
posted by SDC Performance UK